

230v, (G7510) 1/2 hp F, 2 A, 230 volt, Two speed, single phase Hot Tubs, Spas, Hot Tub Covers. *Additional cord length greater than 20’: Specify after C. The hot tub heater and jets pump will likely deactivate. It also contains high voltage starting capacitors, which can start the motor.
SINGLE PHASE PUMP PANEL MANUAL
Hand-off-auto (H.O.A.) toggle switch for manual pump control and green LED Pump Run lightĬontrol board with Power On and Auto (H.O.A. Indoor/Outdoor NEMA 4X rated enclosure: Heavy duty polycarbonate with stainless steel lockable latches Ambilin Incorporate are a trusted name engaged in manufacturing a qualitative range of Submersible Pump Panel Digital Meter Single Phase Digital Starter Three Phase Digital Starter Auto Switch and many more. UL listed for the United States and Canada Each Simplex single pump control panel comes with M-Techs. This panel is UL listed for the United States and Canada and comes standard with a five-year limited warranty.Īdd Pump Portal® remote pump monitoring to this control panel! LEARN MORE Single-Phase Simplex control panels are available in 115/120 Volt, and 208/230 Volt configurations. The controls are housed in a NEMA 4X rated heavy duty polycarbonate enclosure convenient for field wiring. The simplex panels include integrated electronic control and alarm circuitry, an IEC motor contactor, and three floats: Pump On, Pump Off and High Liquid Alarm. If the liquid level reaches the HIGH LEVEL float, the alarm light and buzzer on the control panel will be activated.The SIM-A control panel will alert of a high liquid level and control a 120/208/240V single phase pump in dewatering, sewage, and wastewater pumping applications.

The only reason the water level should ever reach the PUMP 2 ON (LAG ON) switch is because PUMP 1 has failed or cannot keep up with the incoming flow. Global Single Phase Industrial Pump Control Panels Market is divide by types, applications, and regions. If you are using a 4 float setup, and the water level reaches the PUMP 2 ON (LAG ON) float switch, then the alternate pump not set to normally come on will be activated. At this time the alternating relay will switch to PUMP 2 and it will follow this same cycle and the alternating relay will switch back to PUMP 1 and so on. This means that once the liquid level reachs the PUMP ON float that PUMP 1 will run until the liquid level reachs the PUMP OFF float.

The control panel has an alternating relay that switches between PUMP 1 and PUMP 2 after every cycle during automatic operation.

A 4 float setup would have a PUMP OFF, PUMP 1 ON (LEAD ON), PUMP 2 ON (LAG ON), and HIGH LEVEL floats. The standard 3 float setup has PUMP OFF, PUMP ON, and HIGH LEVEL floats. OPERATION OF A DUPLEX CONTROL PANELĪ standard duplex control panel can operate with 3 or 4 float switches. This type of set up ensures that you will always have at least one pump in working order. If one of the pumps fails, the panel will give the high water alarm, and automatically kick on the other pump. Our Duplex panels will alternate cycles between the two pumps, making sure both are in working order throughout the lives of the pumps. The most common application for a duplex control panel is a system that needs a backup pump in place in case the original pump fails. Duplex Control Panels are designed to control a pump stations with two submersible sewage or effluent pumps.
